|
| image = | image_width = | image_alt = | caption = | type = Rapid transit | system = Ningbo Rail Transit | status = Under construction | locale = Ningbo, Zhejiang, China | start = Cicheng | end = Dongqian Lake | stations = 25 | routes = | ridership = | open = 2020 | close = | owner = Ningbo | operator = Ningbo Rail Transit Co.,Ltd. | character = Underground / Elevated | depot = | stock = | linelength = | tracklength = | notrack = 2 | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} Line 4 of Ningbo Rail Transit () is a rapid transit line under construction in Ningbo. It starts from Cicheng Town, Jiangbei District and ends near Dongqian Lake in Yinzhou District.〔Ningbo Environment Protection Design Group. Report of Environment Impact of Line 4, Ningbo Rail Transit. Ningbo. November 2014.〕 Construction of Line 4 started in November 30, 2015.〔(又一条地铁来了!宁波轨交4号线今开工 工期5年 )〕 == Route == Line 4 starts from Cicheng Station in Cicheng Town in east-west direction as an elevated line. Then it turns south into the North External Ring Viaduct where it turns east-west. After reaching Jiangbei Avenue, it starts to turn underground and deviates from the viaduct to Zhuangqiao Railway Station where it turns south, crosses Yaojiang River and reaches Ningbo Railway Station. Then Line 4 goes along Changchun Road, Xingning Road until it reaches Canghai Road and become north-south again. After reaching Shounan Road it turns into southeast direction and reaches Dongqian Lake, its destination.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 4, Ningbo Rail Transit」の詳細全文を読む スポンサード リンク
|